Overview
Services
CNC 5-axis; CNC punching; Press-brake bending; Welding; Metal stamping; Aluminum extrusion; Mold making; Electronics assembly; Enclosures & cabinets; Packaging & kitting; Thin-wall molding ↗
Quality control
Not stated
Delivery
Not stated
- Processes ↗
- Extrusion
- Sheet metal
- CNC machining
- Molds/tooling
- Stamping
- Materials ↗
- Aluminum 6061
- Aluminum 7075
- Aluminum 5052
- Aluminum 6063
- Magnesium
- Industries
- Not stated
- Certificates (listed on site) ↗
- ISO 9001
- ISO 14001
- RoHS
- REACH (certificate listed on site)
About Pailian Aluminium Profile Company Ltd
What they do
Foshan-based manufacturer whose site centres on extrusion, also listing sheet metal, cnc machining. ↗
What’s different
- Offers Aluminum extrusion, with a dedicated service page
As stated on the manufacturer’s website.
| Prototype processes | |
|---|
| Prototype lead time | Rapid prototyping (7–10 days ↗ |
|---|
| Prototype MOQ | MOQ: Start with just 10 ↗ |
|---|
| Production lead time | production duration is 15-25 days ↗ |
|---|
Listed on the manufacturer’s website ↗
Full specifications
Values as stated on the manufacturer’s website. The link icon next to a value opens its source page.
| Capabilities |
|---|
| Max axes | 5-axis |
|---|
| Max part size | Not stated |
|---|
| Tightest tolerance | ±0.1mm (site claim) |
|---|
| Equipment list | Not stated |
|---|
| Materials & finishing |
|---|
| Material grades | Aluminum 6061; Aluminum 7075; Aluminum 5052; Aluminum 6063; Magnesium |
|---|
| In-house surface finishes | Anodizing; Hard anodizing (Type III); Powder coating; Electroplating; Bead blasting; Brushing; Polishing; Painting; Heat treatment; E-coating (listed; in-house vs outsourced not checked) |
|---|
| Quality control |
|---|
| Inspection equipment | Not stated |
|---|
| Reports available (FAI, PPAP, material certs) | Not stated |
|---|
| Volume & lead time |
|---|
| Best-fit batch size | Not stated |
|---|
| MOQ | MOQ: Start with just 10 |
|---|
| Rush lead time | Not stated |
|---|
| Prototype lead time | Rapid prototyping (7–10 days |
|---|
| Production lead time | Production duration is 15-25 days |
|---|
| Other |
|---|
| Industries served | Not stated |
|---|
| What’s different | - Offers Aluminum extrusion, with a dedicated service page
|
|---|
| Founded | 1993 |
|---|
| Certificates (listed on site) | ISO 9001; ISO 14001; RoHS; REACH (certificate listed on site) |
|---|
| City | Foshan, China |
|---|