HM
Manufacturer profile

Dongguan Hongsheng Metal & Plastic Technology Co., Ltd.

Dongguan, China · Injection molding ↗

Dongguan · Injection molding · Since 2005 · Injection molding · Molds/tooling

Max size
Not stated
Tightest tolerance
+/-0.01 mm
Fastest lead time
Not stated
MOQ
Not stated

What stands out

  • Operating since 2005 (site claim) ↗

Overview

Services

Precision grinding; Wire EDM; Sinker EDM; Welding; Plastic injection molding; Overmolding; Insert molding; Two-shot molding; Rapid tooling; Mold making; Hot runner; Vacuum casting; Mechanical assembly; Electronics assembly;… ↗

Quality control

Zeiss; Hexagon; Keyence

Delivery

Not stated

Processes ↗
  • Injection molding
  • Molds/tooling
  • Sheet metal
  • Vacuum casting
  • EDM
  • CNC machining
  • Assembly/box build
Materials ↗
  • Tool steel (D2/H13/SKD)
  • PEEK
  • PEI/Ultem
  • POM/Delrin
  • Nylon PA/PA66
  • PC
  • ABS
  • PTFE
  • PP/PE
  • TPU/TPE
  • Glass-filled nylon
  • Silicone
  • Carbon fiber
Industries
Not stated
Certificates (listed on site) ↗
  • ISO 9001
  • ISO 13485
  • IATF 16949
  • ISO 14001
  • RoHS
  • REACH (certificate listed on site)

About Dongguan Hongsheng Metal & Plastic Technology Co., Ltd.

What they do

Dongguan-based manufacturer whose site centres on injection molding, also listing molds/tooling, sheet metal. ↗

What’s different

  • Operating since 2005 (site claim)

Prototype & production

As stated on the manufacturer’s website.

Prototype processes
  • Rapid tooling
  • Vacuum casting
Prototype lead timePrototyping tools typically take 10 to 15 days ↗
Production lead timeProduction-grade steel tooling (H13 / S136) takes 20 to 35 days ↗

Assembly

  • Mechanical assembly

Listed on the manufacturer’s website ↗

Full specifications

Values as stated on the manufacturer’s website. The link icon next to a value opens its source page.

Capabilities
Max axesNot stated
Max part sizeNot stated
Tightest tolerance+/-0.01 mm (site claim)
Equipment listZeiss; Hexagon; Keyence
Materials & finishing
Material gradesTool steel (D2/H13/SKD); PEEK; PEI/Ultem; POM/Delrin; Nylon PA/PA66; PC; ABS; PTFE; PP/PE; TPU/TPE; Glass-filled nylon; Silicone; Carbon fiber
In-house surface finishesBead blasting; Polishing; Laser engraving; Silk screen/Pad printing; Texturing (VDI/MT) (listed; in-house vs outsourced not checked)
Quality control
Inspection equipmentZeiss; Hexagon; Keyence
Reports available (FAI, PPAP, material certs)inspection reports/FAI/material certs mentioned
Volume & lead time
Best-fit batch sizeNot stated
MOQNot stated
Rush lead timeNot stated
Prototype lead timePrototyping tools typically take 10 to 15 days
Production lead timeProduction-grade steel tooling (H13 / S136) takes 20 to 35 days
Other
Industries servedNot stated
What’s different
  • Operating since 2005 (site claim)
Founded2005
Certificates (listed on site)ISO 9001; ISO 13485; IATF 16949; ISO 14001; RoHS; REACH (certificate listed on site)
CityDongguan, China

Sources

Contact

As published on the manufacturer’s own website. Each item links to its source.

Ready to order? Contact the manufacturer directly.