Overview
Services
Precision grinding; Wire EDM; Sinker EDM; Welding; Plastic injection molding; Overmolding; Insert molding; Two-shot molding; Rapid tooling; Mold making; Hot runner; Vacuum casting; Mechanical assembly; Electronics assembly;… ↗
Quality control
Zeiss; Hexagon; Keyence
Delivery
Not stated
- Processes ↗
- Injection molding
- Molds/tooling
- Sheet metal
- Vacuum casting
- EDM
- CNC machining
- Assembly/box build
- Materials ↗
- Tool steel (D2/H13/SKD)
- PEEK
- PEI/Ultem
- POM/Delrin
- Nylon PA/PA66
- PC
- ABS
- PTFE
- PP/PE
- TPU/TPE
- Glass-filled nylon
- Silicone
- Carbon fiber
- Industries
- Not stated
- Certificates (listed on site) ↗
- ISO 9001
- ISO 13485
- IATF 16949
- ISO 14001
- RoHS
- REACH (certificate listed on site)
About Dongguan Hongsheng Metal & Plastic Technology Co., Ltd.
What they do
Dongguan-based manufacturer whose site centres on injection molding, also listing molds/tooling, sheet metal. ↗
What’s different
- Operating since 2005 (site claim)
As stated on the manufacturer’s website.
| Prototype processes | - Rapid tooling
- Vacuum casting
|
|---|
| Prototype lead time | Prototyping tools typically take 10 to 15 days ↗ |
|---|
| Production lead time | Production-grade steel tooling (H13 / S136) takes 20 to 35 days ↗ |
|---|
Listed on the manufacturer’s website ↗
Full specifications
Values as stated on the manufacturer’s website. The link icon next to a value opens its source page.
| Capabilities |
|---|
| Max axes | Not stated |
|---|
| Max part size | Not stated |
|---|
| Tightest tolerance | +/-0.01 mm (site claim) |
|---|
| Equipment list | Zeiss; Hexagon; Keyence |
|---|
| Materials & finishing |
|---|
| Material grades | Tool steel (D2/H13/SKD); PEEK; PEI/Ultem; POM/Delrin; Nylon PA/PA66; PC; ABS; PTFE; PP/PE; TPU/TPE; Glass-filled nylon; Silicone; Carbon fiber |
|---|
| In-house surface finishes | Bead blasting; Polishing; Laser engraving; Silk screen/Pad printing; Texturing (VDI/MT) (listed; in-house vs outsourced not checked) |
|---|
| Quality control |
|---|
| Inspection equipment | Zeiss; Hexagon; Keyence |
|---|
| Reports available (FAI, PPAP, material certs) | inspection reports/FAI/material certs mentioned |
|---|
| Volume & lead time |
|---|
| Best-fit batch size | Not stated |
|---|
| MOQ | Not stated |
|---|
| Rush lead time | Not stated |
|---|
| Prototype lead time | Prototyping tools typically take 10 to 15 days |
|---|
| Production lead time | Production-grade steel tooling (H13 / S136) takes 20 to 35 days |
|---|
| Other |
|---|
| Industries served | Not stated |
|---|
| What’s different | - Operating since 2005 (site claim)
|
|---|
| Founded | 2005 |
|---|
| Certificates (listed on site) | ISO 9001; ISO 13485; IATF 16949; ISO 14001; RoHS; REACH (certificate listed on site) |
|---|
| City | Dongguan, China |
|---|