Overview
Services
Box build assembly; Mechanical assembly; PCB fabrication; PCBA / SMT; Cable/wire harness; Electronics assembly; High-speed/micro machining; Hardware insertion (PEM); Enclosures & cabinets; Flex/rigid-flex PCB; HDI PCB;… ↗
Quality control
Not stated
Delivery
Not stated
- Processes ↗
- PCB/PCBA
- Assembly/box build
- Sheet metal
- Materials ↗
- ABS
- PMMA/Acrylic
- Silicone
- Ceramic
- Industries
- Not stated
- Certificates (listed on site) ↗
- ISO 9001
- ISO 13485
- IATF 16949
- AS9100
- RoHS
- REACH
- IPC-A-610 (certificate listed on site)
About PCB Assembly China
What they do
Shenzhen-based manufacturer whose site centres on pcb/pcba, also listing assembly/box build, sheet metal. ↗
What’s different
- Offers both Box build and PCBA/SMT under one roof, an uncommon combination
As stated on the manufacturer’s website.
| Prototype lead time | Prototype: 1 week ↗ |
|---|
| Prototype MOQ | No Minimum ↗ |
|---|
| Production lead time | Mass Production: 2–4 weeks ↗ |
|---|
- Box build assembly
- Mechanical assembly
- Electronics assembly
Listed on the manufacturer’s website ↗
- PCB fabrication
- PCBA / SMT
- Cable/wire harness
- Flex/rigid-flex PCB
- HDI PCB
- Through-hole assembly
Listed on the manufacturer’s website ↗
Full specifications
Values as stated on the manufacturer’s website. The link icon next to a value opens its source page.
| Capabilities |
|---|
| Max axes | Not stated |
|---|
| Max part size | Not stated |
|---|
| Tightest tolerance | ±0.025mm (site claim) |
|---|
| Equipment list | Not stated |
|---|
| Materials & finishing |
|---|
| Material grades | ABS; PMMA/Acrylic; Silicone; Ceramic |
|---|
| In-house surface finishes | Electroplating; Brushing; Silk screen/Pad printing (listed; in-house vs outsourced not checked) |
|---|
| Quality control |
|---|
| Inspection equipment | Not stated |
|---|
| Reports available (FAI, PPAP, material certs) | inspection reports/FAI/material certs mentioned |
|---|
| Volume & lead time |
|---|
| Best-fit batch size | Not stated |
|---|
| MOQ | No Minimum |
|---|
| Rush lead time | Not stated |
|---|
| Prototype lead time | Prototype: 1 week |
|---|
| Production lead time | Mass Production: 2–4 weeks |
|---|
| Other |
|---|
| Industries served | Not stated |
|---|
| What’s different | - Offers both Box build and PCBA/SMT under one roof, an uncommon combination
|
|---|
| Founded | 2007 |
|---|
| Certificates (listed on site) | ISO 9001; ISO 13485; IATF 16949; AS9100; RoHS; REACH; IPC-A-610 (certificate listed on site) |
|---|
| City | Shenzhen, China |
|---|